New 3,000
SF data center with access flooring in existing King of Prussia Business
Recovery Center.
Two (2)
existing 300 KVA UPS systems would undergo battery replacement and have
their foundation power and distribution components reconfigured to
accommodate a new 750 KVA UPS with extensive distribution.
Environmental specifications required architectural treatments along with
four (4) twenty ton split system CRAC units. Structural accommodations for
the rooftop equipment was design-build. Building wide environmental
requirements are accomplished with the help of eight new Carel Humidifiers.